View Single Post
Old 04-22-2016 | 09:38 AM
  #2561  
cr700
Gets Weekends Off
 
Joined: Feb 2016
Posts: 290
Likes: 0
Default

Originally Posted by eaglefly
True. It will be other factors that control ultimate flow rates and times.
There aren't "other factors" that control flow rates. It's contractual. If hired today, the maximum wait to flow is 6 years. Realistically, you'll flow in 5 1/2.
Reply