Originally Posted by
cr700
There aren't "other factors" that control flow rates. It's contractual. If hired today, the maximum wait to flow is 6 years. Realistically, you'll flow in 5 1/2.
Yes there are. Any number of external forces could stop the flow, geopolitical, economic or other. Internally, there are too and in fact one is about to commence, that being the Letter T situation, resulting in stoppage, but for now, AAG is metering a handful monthly.
The time frames you represent are simply present estimates and that is fact.