Originally Posted by
jeffmjohnson53
New hire here. Can anyone shed some light on how long until off reserve and average trip length (# of days) for the following:
ATL: 88, 717, 73?
Thanks
Reserve depends a lot on fleet and base. Right now there is a lot of movement so everyone is advancing quickly (relatively). Most trips in the bid package are 3-5 days for those fleets. On reserve you are likely to get some shorter trips that have been broken up too. There are a small % of 1-2 day trips in the bid package, but they go fairly senior usually (depends on the base).