Originally Posted by
shreddykreuger
+1000
I hope our NC adjusts their ask appropriately since "current economic conditions" have changed
Exactly! Our 'ask' needs to be based on an industry average of our peers. If our management insists on dragging this out as long as possible, our 'ask' needs to be moving up, as the industry average is moving up each time another pilot group inks a contract.
The longer our management group drags this out, the more it should cost them.