Originally Posted by
phoenix 23684
I'm a bit confused. For a company trying to go public and maximize on an IPO, there doesn't seem to be much logic in their part. Pilot labor relation issues, long tarmac delays, bottom on performance ranking. Are they trying to sabotage their own IPO?
The pilot group doesn't need to do anything to sabotage their operations. This management group is taking care of it for us. I know I shouldn't be, but I'm a little surprised that heads aren't rolling.