Originally Posted by
ncsean
1) ORD and DTW right out of training or by being done with IOE, LAX junior FO is 8/4 hire date, PHX 8/12.
2) DTW a month or two, the rest would vary a lot. But with upgrades at 2 years 2 months everything is attainable pretty quick.
3) answered above
4) Alaska just switched to all 175s the rest is a mix I believe
Thanks. Sounds like LAX and PHX are fairly quick to get also. Looks like 2 months or so. Looking to go on the CRJ side.