Thread: Skywest v2.0
View Single Post
Old 10-08-2016 | 02:39 AM
  #3687  
mdcny
Line Holder
 
Joined: Aug 2013
Posts: 58
Likes: 0
From: CRJ FO
Default

Originally Posted by ncsean
1) ORD and DTW right out of training or by being done with IOE, LAX junior FO is 8/4 hire date, PHX 8/12.

2) DTW a month or two, the rest would vary a lot. But with upgrades at 2 years 2 months everything is attainable pretty quick.

3) answered above

4) Alaska just switched to all 175s the rest is a mix I believe
Thanks. Sounds like LAX and PHX are fairly quick to get also. Looks like 2 months or so. Looking to go on the CRJ side.