Forget instruction in PBS
I'm trying to get Thanksgiving off (along with everyone else) but I'd rather a line working Tday vs. reserve. There used to be a forget and redo for PBS but now there is only a forget instruction. When PBS sees the forget instruction, does it automatically rerun from the top or do I need to find the redo command?
My bid looks something like this...
1. Award trips
2. Vac slide....
3. Prefer off TDay
4. Award....
5. Award.....
6-13. Award....
14. Forget 3
15. Clear schedule start next bid group
16 Reserve bid.
Is that correct or does line 15 need to be redo from 4?
Thanks, E