Thread: Skywest v2.0
View Single Post
Old 11-20-2016 | 11:04 AM
  #4277  
unlarge
Line Holder
 
Joined: May 2013
Posts: 43
Likes: 0
Default

Originally Posted by slinger
Any insight as to crj reserve times at ORD? Was asked a couple of pages ago, but no replies. I have been told it is now like 9 months where it was almost nonexistent a month or two ago.
3/28/16 hire just got composite line awarded in ORD,
so 9 months sounds about right.
its horse**** about nonexistent reserve for at least since April. That's pretty much last time reserve coverage was below 10% on a CRJ side, since then it's only getting higher, probably except couple of months during busy summer months.
DTW, FAT probably the only bases now where newhire CRJ FO could expect a line withing 6 months, everywhere else it'll be 9+ months, until we magically get a lot of new contracts. Even in MSP people on reserve forever nowadays.
PS I might be wrong and everything will change in a couple of months, but that what I see based on my class.