Thread: Express Jet
View Single Post
Old 11-27-2016 | 08:50 AM
  #124  
Der Meister's Avatar
Der Meister
Line Holder
15 Years
 
Joined: Apr 2008
Posts: 930
Likes: 11
From: 320A
Default

Originally Posted by ejet
Something to keep in mind about upgrade: XJT barely hired any pilots between end of 2007 and 2011. Once they finish upgrading 2007 hires upgrade time will drop. How much will it drop? I can't sit here and confirm it will drop 4 years because its a regional and nothing is predictable. But its something to think about.
They have been saying that same dribble for years. Guess what there are still about 50 guys, that are from 2007. At the current rate of upgrades that will take another 2-3 years. The only thing that is predictable is XJT is loosing airframes, it will dwindle to 100 airframes on the LXJT side over the next year.
Reply