Originally Posted by
Flyin J
Just for clarification are the days on/days off lumped together in 16/12 or more like 4/3 or 8/6 or some iteration?
85% or so of available lines are constructed one block of 16 on with a block of 12 off. This includes RSRV lines. This helps Co. with their travel costs.
The rest are a miss-mash.