Originally Posted by
bottoms up
You nailed it! The lack of consistency and transparency is frustrating.
If you want 1 or 10 SC guys I don't care but make it consistent. Assigning everyone a SC then rolling guys days just because they can with no recourse shouldn't be the normal way we operate. .
Bingo! If you want 10 SCs a day that's fine but don't build 15 just because you have can.
SFO 787FO get a 7am and a 10am usually to 1-2 day guys. Then they build 3 6pm and 3 8pm, all logical and good coverage. Then they get a bunch of pilots checking in on the same day and they assign 3 1pm and 2 7pm and extra 10am......WHY? Thee only answer I ever get is we need to cover the operation.