Thread: Skywest v2.0
View Single Post
Old 03-14-2017 | 05:34 PM
  #6240  
hotbreeze
Newbie
 
Joined: Jan 2017
Posts: 125
Likes: 0
Default

Originally Posted by Turbosina
The last award into LAX/175 was awarded 12/20/16, went to a guy out of training. However there were no FOs allowed into LAX/175 in January, Feb, or March.

Junior LAX/175 guaranteed lineholder is a Jan 2016 hire, so that's 15 months of reserve.
Which base has the shortest wait on the 175 to be a guaranteed lineholder? What is its wait?