View Single Post
Old 04-18-2017 | 10:28 AM
  #2  
No Nonsense
Line Holder
 
Joined: Mar 2017
Posts: 35
Likes: 0
Default

Not necessarily better read the contract again!
only 8-D-1 Equipment Training Freezes (contractual term)

Freezes are released New Category Vacancy bidding for 6 Month from the first effective date for 8-D-1 Equipment Training Freeze but not for 8-D-2 Bidding Freeze as that associated language is for new Bases only.

Under 8-D-1-e a New Category (e.g. DCA 787 CAP & FOs). are considered “New” for all Vacancies with effect dates within 6 months of the effective date of the first vacancy bid in that New Category. You still will incur a freeze if required under the associated paragraph. For 8-D-2-c this does not apply as this is not a New Base (example MSP 737 or LAS 320)
2-F Base means a geographical location designated by the Company where pilots are based.

2-K Category is a Base, Equipment, and Status combination (e.g. ORD 756 F/O) to which a Pilot is assigned.

Applies
8-D-1-e An Equipment training freeze shall not restrict a Pilot from bidding to a “new” Category (a Category shall be considered “new” for all vacancies with advertised effective dates within six (6) months of the advertised effective date of the first vacancies bid in that new Category).
Does not apply
8-D-2-c A bidding freeze shall not restrict a Pilot from bidding for a Captain vacancy in his current Equipment type, nor from bidding to a new Base (a Base shall be considered "new" for vacancies with effective dates within six (6) months of the effective date of the first vacancy bulletin for that new Base).
Reply