Originally Posted by
BoilerUP
I'd take that bet.
Look at FAR 25 and the redundancies required in transport aircraft for...then square that with reducing redundancy from eliminating pilots.
Also consider the required reliability of infrastructure involved, both in airframes and ground equipment like datalink. How would MELs work?
Me too, mainly for the same reason FedEx was still flying 727s up until several years ago.