Originally Posted by
P-3Bubba
I got a 0300 assignment in a 4 day silo. I called and said " U know ur going to give me a 1 day to JFK." Response: "No, well maybe".
5 1-days on rsv. The DRO = Throwing darts at names.
I said, "Will my 0300 stick?" (It was 1100 the day prior) Response: "Up until 1200 it could change, according to the FSM"
Making the rules work for them!!
-Bubs
Now see I like the 240am time on day one of 6
Or when the DRO does not match flica.
The funny thing is durning one union meeting they said the head of scheduling had been easy to work with trying to get the scheduling section done. I can't wait for back and white rules so we can stop with this DRO BS and all the other stuff they pull.