Thread: 2018 UPS hiring
View Single Post
Old 10-08-2017, 07:31 AM
  #5  
BoilerUP
The NeverEnding Story
 
BoilerUP's Avatar
 
Joined APC: Sep 2005
Posts: 7,511
Default

Originally Posted by Swedish Blender View Post
It was straight out of a training center manager.

I believe you were told that, and could believe SOMEBODY at some point suggested it, but I just can't believe they actually tried to do that.

No, I'm not new here any more, but I do have a passing idea how this stuff works on the design/construction side.

I heard from a "projects" manager the building was designed to be built in phases, with this Phase I and subsequent phases able to be built without impacting training in the existing space. Long-range plan : move all training to Edgewood and utilize existing TC for more ramp space.

I'll bet you a single shiny dollar Trading Places style as to what actually happens :-)
BoilerUP is offline