Originally Posted by
767pilot
UPS has a bad history of this (Challenge Air). In this case though, we would need the pilots. No way we would be able to train 600 replacements in the year that our contract allows them to operate a purchased airline seperatly.
Why would we need the 600 pilots? Ups has no interest in the 747-200's and I don't think they would want all the leased AC at once.