View Single Post
Old 12-05-2017 | 11:55 PM
  #54  
Datsun
On Reserve
 
Joined: Apr 2014
Posts: 122
Likes: 0
Default

Wasn't this flow reduction always the plan?

This was posted 2/1/2017 @07:09 pm in the Envoy thread. I remembered reading something like this about Envoy's flow; I had to search for it.

Originally Posted by MidLife
From their own materials, (Q3 2016), they had 202 of the 824 group, flowing at 30/mo (7 months), 1109 of the Protected Pilot group flowing at 25/mo (44 months), 149 of the DOS group flowing at 15/mo (10 months), and 295 new hires after 12/14 flowing at 15/mo (20 months)

If they added 30/mo for 10/16 thru 1/2017 = 120 NH (8 months to flow them)

With NO attrition, I add the months 7 + 44 + 10 + 20 + 8 = 89 months + 10/2016 = 3/2024 flow date for a 2/2017 NH. 7 years!
or to answer your question, the first NH after 12/14 will flow at 61 months from 10/16, or 11/21.

However, attrition is huge - they have 1800 pilots. If one assumes 15/month (about 1%) attrition, which will be all senior to the NH in the beginning (though all junior at the end). This means a quicker flow.
So I would guess that 7 years is the outside number. I think they are posting inside 6 yr flow, and I think that is not outlandish. But don't think 3-4 years - no one is projecting that.

No, I don't work there.
Reply