View Single Post
Old 01-14-2018 | 06:43 AM
  #194181  
sailingfun
Gets Weekends Off
 
Joined: Feb 2008
Posts: 20,876
Likes: 193
Default

Originally Posted by tunes
PBS coverage and icrew required/available have nothing to do with each other. Why? I couldn't tell you.
The two are completely different systems and one is static and one dynamic. As I posted many times here the reserves required table should be called something else like swap drop availability. It sole function is to decide if swaps or drops are allowed based off a contractual formula. It has no bearing on PBS or desired or actual reserve Manning by the company.