View Single Post
Old 01-20-2018 | 06:29 AM
  #194245  
Aggie94
Line Holder
 
Joined: Jun 2015
Posts: 30
Likes: 0
From: 73NB
Default

Originally Posted by Han Solo
What's the maximum block we're allowed to be assigned in 1 day for an unaugmented crew? I could've swore it was 8 hours of block in a day but I just saw a trip in open time with 8:10 scheduled block.
It depends on your report time. If you report for duty between 0500-1959 (based on the time of your last acclimated station, which is on shown on your rotation) your max block is 9 hours. Otherwise, it's 8 hours.