Originally Posted by
daveetasac
Drop Trip Sequence
Basically, as a line holder, if your vacation block touches any sequence, the “left-over” days on either end are dropped. You’re only paid for the days within your vacation block. The dropped days surrounding your vacation are unpaid.
Question on how DTS works. Vacation blocks begin on Saturday, so by touch, your affected trip has to end on Saturday or Sunday say, NOT Friday? Most don’t have weekends off, so you would probably be able to get something that overlaps on both ends, but again, it is overlapping to be considered touching?