View Single Post
Old 03-23-2018 | 08:52 PM
  #5944  
todd1200's Avatar
todd1200
Line Holder
 
Joined: Aug 2007
Posts: 1,044
Likes: 2
Default

Originally Posted by feltf4
If you had a one day pairing that was canceled and modified to letter X. Which showed at the same time as your OSP and went outside original footprint pairing. Which was later then canceled, do you still get the 5 hours JRA Prem? I was under the impressions that you got it because you started the footprint of that newly modified pairing.

No flights were operated.
There was a grievance related to this (1-20-2017). If you actually stayed on duty after your scheduled release time with the intention to operate, you get 5 hours EPS. If the flight was cancelled before your scheduled release, and you didn’t actually sit beyond OSP footprint, you get 2 hours straight pay.
Reply