Originally Posted by
Raidr17
I was at recurrent three weeks ago and CD talked to us. Growing pilots from 100 (50/50) to 500 (250/250) by late spring 2019. Everyone in LAX ETOPS trained along with 1/3rd of OAK. OAK ETOPS was required for line building to incorporate the inter island flying.
That’s the gouge I was looking for!
What’s the deal going to be for the ETOPS qual?