Thread: Mesa 3.0
View Single Post
Old 03-27-2018 | 07:22 PM
  #5621  
flysooner9's Avatar
flysooner9
Gets Weekends Off
 
Joined: Nov 2008
Posts: 1,723
Likes: 0
Default

Originally Posted by calmwinds
The standing bid is out. Ejet upgrades went from 23 months to 25 months. My guess this (only 4 upgrades) is a result of the pitiful retention of Ejet FO’s (we lost 15 net Ejet FO’s last month) and the pitiful Ejet training program (we are still taking months to get pilots to IOE). Compass and Mesa are pretty much in a tie for the shortest Ejet upgrades, although SkyWest has been rumoring their new LGA base may award street Ejet CA’s.

A positive note is CRJ upgrades, which had been gradually increasing, fell from 24 months to 5 months. Or, basically, just a little longer than street CA’s and on par with industry.
What’s the junior CRJ captain base?
Reply