Originally Posted by
Swingline78
8-10 years for upgrade at SWA. If you want to upgrade faster (in NB and depends on base) UAL will probably get you there faster.
Guys that were hired in this latest wave should have substantially lower upgrade time. Probably in the 5-7 year range presuming we stick with the numbers being thrown out.