I doubt it. SWA is slow to open pilot bases and usually does it in locations with a lot of flying.
It will be 3 day OAK/LAX trips. Day 1 fly there, maybe one additional leg, short overnight. Day 2 inter island, Smedium overnight 15 hours or so. Day 3, 1-2 short legs and fly home.
There will be enough crews overnighting to absorb scheduling drama.