View Single Post
Old 05-27-2018 | 05:58 AM
  #85  
SoarHigh757
Gets Weekends Off
 
Joined: May 2018
Posts: 134
Likes: 0
From: CRJ-200 FO
Default

Originally Posted by KelvinHelmholtz
No you’re looking at the bid packs. Go to PBS and on the top bar Reports -> Catetory Line reports and then whichever base and seat you want to see.
Ah, thank you! So looking at the reports, at DTW most junior 200 FO line holder for June is a 10/17 hire, while at ATL most junior is 12/17 hire. Thus reserve at DTW is roughly 8 months vs 6 months at ATL (at this point in time and flying volume).
Reply