Originally Posted by
SoarHigh757
Ah, thank you! So looking at the reports, at DTW most junior 200 FO line holder for June is a 10/17 hire, while at ATL most junior is 12/17 hire. Thus reserve at DTW is roughly 8 months vs 6 months at ATL (at this point in time and flying volume).
If it helps, the most JR ATL line holder CRJ200 CA is a 10/2017 hire.