Originally Posted by
FNGFO
The take away? It’s all about how it’s applied.
This is 100% correct. It isn’t pbs it’s the contract that’s behind it. I think with our rigs and days off it won’t be that bad. I’m assuming you had pbs at a regional like I did and sure it was terrible but it wasn’t PBS’s fault. It was the garbage contract that we had. 6 day stretches followed by 1 day off at the monthly transition followed by another 6 on wasn’t uncommon. But here the contractual rules will prohibit stuff like that from occurring.
Sent from my iPhone using Tapatalk