Originally Posted by
symbian simian
TWIRI according to the CBA within 3 hours they can do what they want, so adding a pairing to you pairing is CBA compliant. The 2 check-ins only refers to check in after a rest, no rest no check in.
Having said that, They can only do that a exhausting X/Y, so only do it for 200%.
Incorrect. Second sentence of 25.I.1. More specifically addressed in 25.I.3
The only thing they have relief on inside three hours is using a Y list over an available reserve or 25.G.2.b.5 which means they can go straight to junior assignment if they need.
They absolutely cannot just tack stuff on to the end of your pairing.