Originally Posted by
Cyio
I’m assuming he means 1 year after the 2007-2011 group is done. I could be wrong.
This does add up pretty close though as the 2016 new hires are 3-4 years out from now.
That is correct. So, by the end of 2021 or so, Envoy will have flowed all the 2007-2015 hires.
Should have said 2012-2015 is forecast to flow during another 1 year, AFTER all the 2007-2011 will have flowed. Sorry for the confusion.