Originally Posted by
Han Solo
Trip coverage ladder. Reroute is step 22, long call RES into an XX day is 23, and short call RES pilot into an XX day is 24. ALPA can check if they followed the ladder, either way you must fly now/grieve later. Could result in assignment pay and reroute pay.
break break
I was on LC today and was passed for a GS. I thought that 23.O.12 would apply, but ALPA tells me that is a carry-over relic of the contract that was not properly updated when FAR 117 was published. According to ALPA the only GS a LC pilot can get under that provision is one that reports between 10 and 12 hours from the assignment. He sounded very confident in his answer but it's most definitely not what the contract states. Can anybody verify that FAR117 has a provision that trumps this part of the contract?
Two things here. One the coverage ladder does not apply for a delayed flight. It applies during the award process as the rotation was originally constructed.
On the GS award the contract never trumps the FAR’s. FAR’s take precedence.