Originally Posted by
FullThrust
Right, but there were not many people hired during the 2008-2011 timeframe. So the flow time will drop significantly once the last 2008 hire flows. Also, the ALPA flow projection assumes zero outside attrition. While the outside attrition isn’t that large, it is still a non-zero number and as such will lessen the ALPA projections.