Originally Posted by
BeamMeUp
23.E.2
Requests for the following schedule alterations will be processed in the following order:
2 a. MLOA (see Section 13 D.),
3 b. IVD (See Section 23 I.),
4 c. APD (see Section 23 I.),
5 d. PD and X-day moves (see Section 23 I. and Section 12 M. 8.),
6 e. recovery slips (see Section 23 J.),
7 f. white slip (see Section 23 P.), and
8 g. swap with the pot (see Section 23 H.)
So a junior guy could pick it up on a WS if you straight swap and don’t PD and then WS it.
Love how our PWA pretends like MLOA is a request....