View Single Post
Old 09-12-2018 | 06:10 AM
  #9740  
Bucking Bar's Avatar
Bucking Bar
Can't abide NAI
 
Joined: Jun 2007
Posts: 12,078
Likes: 15
From: Douglas Aerospace post production Flight Test & Work Around Engineering bulletin dissembler
Default

Word from the top, 250 to 300 needed for Summer 19. ~1,000 a year thereafter for as far as they can read the plan. Figure retirements and ~2 to ~4% YOY growth. The network supporting more larger jets than smaller jets right now. Move everything up one. If it is was planned as a 737-800, probably can use a -900. 767 to A330 etc ....
Reply