View Single Post
Old 09-26-2018 | 11:22 AM
  #9794  
Planetrain
Line Holder
10 Years
 
Joined: Jun 2015
Posts: 1,994
Likes: 176
Default

Originally Posted by saturn
My opinion is we should have the taxi checklist tasks completed at the gate (WDR received) on push (set flaps). Do a quick FTL CTRL check, then call taxi. Get both pilots heads up.
Didnt we used to do this with the performance checklist at the gate? I liked that way better. If I remember correctly, it was sacrificed to get us off the gate faster.
Reply