View Single Post
Old 10-10-2018 | 02:30 PM
  #922  
week
Gets Weekends Off
 
Joined: May 2017
Posts: 516
Likes: 0
Default

"Do not bid pairing length or pairing ID on date on the same layer with trip mix in a work block or with commutable work block. If you do, the work block bids will be ignored.

You can bid pairing ID and commutable work block on the same layer, which will create work blocks that utilize the pairings specified (the pairings need to fulfill the report and release requirements stated in the commutable bid)."

Just got this in the PBS guide, is it just me or do these two statements contradict eachother? Trying to bid specific pairings but allow the system to throw some stuff in to complete the month,