Originally Posted by
bigtime209
Between the mainline base there, the Republic base there, the PSA base there, plus us and PDT doing fly through, I don’t see us opening a base there.
Markets like DCA-LAN don’t need a 700/900/175, so that will eliminate PSA and YX. PSA is also trading 200’s for 900’s next year so they will have fewer available for small markets. PDT could do some fly through, but if they are almost done taking our planes, then it would require a massive re-shuffle on their part. It seems like the schedule in DCA is large enough to warrant a base, and we have pretty easy rules about openeing and closing them now. I’m just saying that it’s possible. Nobody knows with AAG.