Originally Posted by
greendotplus10
Just to clarify, are you seeing a 2 year, 2 month upgrade from DOH to effective date, or to posted date?
The bid that closes on the 5th of every month is effective 4 months later, and upgrade training begins about 1 month before the effective date. A memo was sent out earlier in the month about the bid that closed November 5th, effective March 2nd. From this I was able to see that the junior upgrade was just shy of 2 years, 6 months (DOH to effective date).
Via the posted date, so that individual should be a line captain by 2 yrs 6 mos.