Originally Posted by
Cyio
Yeah but if an FO is blasting out 1000 hours in 21 months, everything is going perfect for them and they are not too worried about what aircraft they upgrade on.
Heck, you can lose 3 weeks with your vacation bidding if done correctly, would assume people do get sick occasionally, that can be stretched. Upper seniority reserve barely flies you at all on it, so you can also leverage that as a boost.
If you really want the seat you can get to it, but I agree if you are right seat in ORD on it, you will be ready for upgrade before your seniority is unless you have some stalling tactics in place. Although, at least in ORD, you dont need much more than 21 months seniority to hold it.
I have learned over the past few years that it's very hard to determine what people are going to do. We went from complaining about upgrades being too long to too short.
I would agree with you if our 175 fleet numbers were to stay the same. However with a growing fleet the scenario may change. Also, the CRJ is leaving which will cause another displacement eventually and shake up this situation even more (my guess is that this would not favor the fast to 1000 guys). The key is all about timing and seniority and the future is full of incalculable situations. My suggestion is just cross your fingers and hope for the best and make as much money as you can.