Originally Posted by
ShyGuy
"Fatigue mitigation rules" makes max 4-leg days.
Speaking of which, can any Boeing pilots give me a compelling reason to keep the
L-AS pilot group imposed (NOT contractual) "5:51 rule?" Are we all on the same page that this limits productivity and contributes to the disastrous QOL on the Boeing side?