Thread: Feb line awards
View Single Post
Old 01-15-2019 | 06:23 PM
  #34  
captkdobbs's Avatar
captkdobbs
Back on Reserve
Veteran: Army
10 Years
On Reserve
20 Countries Visited
 
Joined: Dec 2012
Posts: 845
Likes: 29
Default

They publish the ALV and the bid window. They can run a solution that has buffers at the high and low end as long as they don't exceed the window. They can limit the number of 'Min credit' and 'Max credit' bids. I'm assuming they can tweak the number of RLLs. And they can adjust the open time constraints as long as they don't exceed PWA limits.

Lots of things to get the "cost" of a run down. Run/evaluate/run/evaluate/run/evaluate/send to ALPA for review/PUBLISH.
Reply