Originally Posted by
StartngOvr
Yellow Slip Question:
I’m in the two day bucket long call Th/Fr and I’m first in line. There’s one open two day rotation looks like I will get it. So, on Tuesday I put in a Yellow slip to be first in line for short call on Thursday. Im assuming the trip will instead go to the next guy in the 2 day bucket, as I will get my desired short call RAP. (I’m assuming they don’t get many people requesting to be put in short call)
Scheduling ignores my yellow slip request and instead assigns me the trip on long call instead of placing me on short call. Scheduler told me they cover the trips via long call first THEN look at the yellow slips for SC. Is this correct? I think it sucks, as someone else will probably get a short call RAP they don’t want and I’ve got a trip I don’t want. I’ll call DALPA later, it’s too early this AM.
Sent from my iPad using Tapatalk Pro
Scheduling is correct. Trips are covered first, then SC
Sent from my SM-N950U using Tapatalk