Originally Posted by
Winston
Did we skip over “Vacancy 19-06” for some reason like the 13th floor of building?
The number corresponds to the year-month that the bid is effective. So, since this bid is effective the first day of the July bid month (6-30) it is an -07 bid.
The last bid was effective in May, so it was an -05 bid.
Since there was so much time between this bid and the last one, we skipped right over any option to have a bid effective in June