Originally Posted by
flydiamond
Entirely depends on attrition, growth and future hiring en masse. The last two seen like more of an “if” lately and the attrition hasn’t been so heavy lately as Delta has seemingly scaled back their hiring for 2019, which our DGI only has a 50% success rate for anyways. I’d think 9-12 months is realistic for a new hire today in NYC, although it you aren’t a STEP student you won’t be getting a class til the fall anyways.
I was told for September is that accurate?