Originally Posted by
FNGFO
Maybe they won’t be able to get concrete or asphalt. Give me a break.
Like with the construction equipment and workers, it would have to be shipped in from the mainland.
In this case, don’t be surprised if the union workers refused to unload the ships, leaving said equipment and concrete stuck in the harbor. What, is all of that equipment going to be flown out here in Boeing-guppies?
Please, stop before you make a complete fool out of yourself. You have no idea what it’s like out here.
Nextera Energy is a multibillion dollar fortune 200 company that tried to come out here and show the locals how things worked. They were sent packing back to the mainland with their tail stuck between their legs.
They presented a good business model that would’ve brought a lot of good things to the island chain. At the end of the day, it didn’t matter because it would’ve upset the pineapple cart. The residents revolted against it and kept their high power rates and antiquated infrastructure as opposed to overturning the pineapple cart.