Sorry but programming doesn't work that way. You don't have complete control over either with line bidding (you're RAP lining up exactly with your desired days off). If the reserve rules were less rigid allowing a mix of RAPs per block then it would be more flexible. One has to have priority over the other. You just get to see it before hand with line bidding because the company is already building lines with the exact number of lines with the RAPs they need. Days off as much as possible. Since RAPs must be over the entire month, one is flexible, one isn't. No wonder they chose days off.