Originally Posted by
word302
Honestly the smartest thing you could do is take the CRJ and go for a PSP base. I know, I know, SAN only has ERJs. You will likely get PSP before you finish training or soon after, hold a line faster, and be able to hold a CA position within a few years. Not only that, but if you decide to switch to the ERJ after your seat lock, upgrading in the CRJ will be piece of cake. You won't hold a CA seat in SAN for 5-8 years minimum unless something drastically changes.
I’m a new hire and I start CRJ training in July. Like stnkbg1, I live in San Diego, so PSP is on my radar too. Any idea what kind of trips are flown from PSP (4 days?). How soon could I realistically hold a line there? Thanks for any responses!