Originally Posted by
PassportPlump
It’ll more than likely be a while, a ton of people bid out of NYC on MOAB 2019. So these positions will need to be filled by new hires as those guys move out of NYC.
Then next year when people bid out of NYC the process will repeat itself.
As for 10 people in class, guys are going from Indoc to IOE in 8-10 weeks (with the exception of the 220). So their “simulator optimization” tool is working to pump people through pretty quickly.
Is the 220 timeline slower? Just asking as a 220 guy trying to get off reserve