Originally Posted by
Turnamdburn200
Just remember, the standards for the check-ride and tasks that must be completed are set by the FAA. The completion standards are similar for all regionals, the only difference is the process to get people to the checkride. Just imagine having 2 flight schools side by side on the same airport, one gets students a private license in 42 hours on average with less than 10% washout. The second takes 65 hours and has a 50% completion. Both use the same DPEs. Something is seriously wrong at school number 2 in how they train. This is Air Wisconsin right now. It has nothing to do with the material being taught but rather how it’s taught.
Have you been through another regionals training program?